A/D FIREBARRIER FIRESTOP SYSTEMS

Plumbing - Application Designs and Reference Guide

STEEL & IRON PIPE

 

 

 

 

 

Max. Size

Penetration

Diameter

Rating

 (h)

Max Size

Opening

Floor or Wall

System

A/D Firebarrier

Product Required

Application

Thickness

System No.

 

CONCRETE  CONSTRUCTION

12 " diameter or

Smaller - see system for options

3

0" to 2"

annulus

Floor - Concrete

Wall - Concrete

  Concrete Block or Precast  (hollow core) Conc.

A/D Firebarrier

 Intumescent Sealant

_____________

A/D Firebarrier

Mineral Wool

Min. 1/4 inch thick within annulus flush with top of  floor or both surfaces of wall

_____________

Min. 4 1/4 inch thick packed into opening  (wall both sides)

C-AJ- 1557

 

24 " diameter

or smaller

3

0" to 1 1/8”

annulus

Floor - Concrete

Wall - Concrete

 or Concrete Block

A/D Firebarrier

Silicone

-----------------

A/D Firebarrier

Mineral Wool

Min. 1/2 inch thick within  annulus flush with top of  floor or both surfaces of wall

_____________

Min. 4 inch thick packed into opening  (wall both sides)

C-AJ-1497

 

8 " diameter

or smaller

3

0" to 1 7/8”

annulus

Floor - Concrete

Wall - Concrete

  Concrete Block

Precast  (hollow core) Conc.

 

A/D Firebarrier

 Intumescent  Sealant

_____________

A/D Firebarrier

Mineral Wool

Min. 1 inch thick within  annulus flush with both surfaces of  floor or wall

_____________

Min. 1” inch thick packed into each side of opening floor & wall, recessed to take sealant

C-AJ-1561

 

8 " diameter

or smaller

2

0" to 3 7/8"

annulus

Floor - Concrete

Wall - Concrete

 or Concrete Block

A/D Firebarrier

Silicone

------------------

A/D Firebarrier

Mineral Wool

Min. 1/4 inch thick within  annulus flush with top or bottom  of  floor or both surfaces of wall

_____________

Min. 4 inch thick packed into opening  (wall both sides)

C-AJ-1229

 

GYPSUM WALLBOARD CONSTRUCTION

12 " diameter

or smaller

1 & 2

0" to 1 7/8"

annulus

Wall -Gypsum

Board as rated for 1 & 2 hr

A/D Firebarrier

 Intumescent Sealant

Min.1/2” or 5/8” inch thick within annulus, flush both surfaces of wall

Foam Bakker optional

W-L-1416

 

8 " diameter

or smaller

2

0" to 7/8”

annulus

Wall -Gypsum

Board

A/D Firebarrier

 Intumescent

Sealant or Acrylic

_____________

A/D Firebarrier

Mineral Wool

Min. 1/2 inch thick within annulus, flush both surfaces of wall

_____________

Min. 1/ 2 inch thick packed into opening both sides of wall

W-L-1417

 

2 " diameter

or smaller

1 & 2

0" to 1-7/8"

annulus

Wall -Gypsum

Board

A/D Firebarrier

Silicone

Min.5/8 inch thick within annulus, flush both surfaces of wall

W-L-1198

 

WOOD CONSTRUCTION

8 " diameter

or smaller

1 & 2

0" to 7/8"

annulus

Floor - Lumber

Ceiling - Gypsum

Board

A/D Firebarrier

 Intumescent Sealant

Min.5/8 inch thick within annulus on top at floor

Min. 5/8 inch thick within annulus on bottom surface ceiling- ½” crown

F-C-1149

 

6 " diameter

or smaller

1

1/4"

annulus

Floor - Lumber

Ceiling - Gypsum

Board

A/D Firebarrier

Silicone

Min.1 1/8 inch thick within annulus on top at floor

Min. 1/2 inch thick within annulus on bottom surface ceiling

F-C-1011

 

4 " diameter

or smaller

1

0” to 7/8”

Floor - Lumber

Ceiling - Gypsum

Board

A/D Firebarrier Intumescent sealant

Foam Bakker Rod

Min.1/2 inch thick within annulus on top at floor

Min. 1/2 inch thick within annulus on bottom surface ceiling and ¼” at point of contact

Foam Bakker Rod

F-C-1150

 

   

HOME                                                                                    BACK  

 

A/D FIREBARRIER FIRESTOP SYSTEMS

Plumbing - Application Designs and Reference Guide

COPPER (Pipe & Tube)

Max. Size

Penetration

Diameter

Rating

 (h)

Max Size

Opening

Floor or Wall

System

A/D Firebarrier

Product Required

Application

Thickness

System No.

 

CONCRETE CONSTRUCTION

6 " diameter or

Smaller - see system for options

3

0" to 2"

annulus

Floor - Concrete

Wall - Concrete

  Concrete Block or Precast  (hollow core) Conc.

A/D Firebarrier

 Intumescent Sealant

_____________

A/D Firebarrier

Mineral Wool

Min. 1/4 inch thick within annulus flush with top of  floor or both surfaces of wall

_____________

Min. 4 1/4 inch thick packed into opening  (wall both sides)

C-AJ-1557

 

6 " or

smaller

3

0" to 1 1/8”

annulus

Floor - Concrete

Wall - Concrete

 or Concrete Block

A/D Firebarrier

Silicone

-----------------

A/D Firebarrier

Mineral Wool

Min. 1/2 inch thick within  annulus flush with top of  floor or both surfaces of wall

_____________

Min. 4 inch thick packed into opening  (wall both sides)

C-AJ-1497

 

4” or

 smaller

3

0" to 2”

annulus

Floor - Concrete

Wall - Concrete

  Concrete Block or Precast  (hollow core) Conc.

 

A/D Firebarrier

 Intumescent Sealant

_____________

A/D Firebarrier

Mineral Wool

Min. 3/4 inch thick within  annulus flush with top of  floor or both surfaces of wall

_____________

Min. 3 3/4 inch thick packed into opening  (wall both sides)

C-AJ-1557

 

4” or

       smaller

2

0" to 7/8 ”

annulus

Floor - Concrete

Wall - Concrete

  Concrete Block or Precast  (hollow core) Conc.

A/D Firebarrier

 Intumescent Sealant

Foam backer rod

 

Min. 1/2 inch thick within  annulus flush with top of  floor or both surfaces of wall

 

C-AJ-1557

 

GYPSUM WALLBOARD CONSTRUCTION

4 " or

smaller

1 & 2

0" to 1 7/8”

annulus

Wall -Gypsum

Board

As per F rating of wall

A/D Firebarrier

 Intumescent Sealant

Min.1/2” or 5/8” inch thick within annulus, flush both surfaces of wall and its rating

Foam Bakker Rod Optional

W-L-1416

 

4 " or

smaller

2

0" to 7/8"

annulus

Wall -Gypsum

Board

A/D Firebarrier

 Intumescent

Sealant and Acrylic

_____________

A/D Firebarrier

Mineral Wool 

Min. 1/2 inch thick within annulus, flush both surfaces of wall

_____________

Min. 1/2 inch thick packed into opening both sides of wall

W-L-1417

 

2 " or

smaller

1 & 2

0" to 1-7/8"

annulus

Wall -Gypsum

Board

A/D Firebarrier

Silicone

Min.5/8 inch thick within annulus, flush both surfaces of wall

W-L-1198

 

WOOD CONSTRUCTION

4 " or

smaller

1

1/4"

annulus

Floor - Lumber

Ceiling - Gypsum

Board

A/D Firebarrier

Silicone

Min.1 1/8 inch thick within annulus on top at floor

Min. 1/2 inch thick within annulus on bottom surface ceiling

F-C-1011

 

4 " diameter

or smaller

1

0” to 7/8”

Floor - Lumber

Ceiling - Gypsum

Board

A/D Firebarrier Intumescent sealant

Foam Bakker Rod

Min.1/2 inch thick within annulus on top at floor

Min. 1/2 inch thick within annulus on bottom surface ceiling and ¼” at point of contact

Foam Bakker Rod

F-C-1150

 

   

HOME                                                                                    BACK 

 

 

A/D FIREBARRIER FIRESTOP SYSTEMS

Plumbing - Application Designs and Reference Guide

PLASTIC & GLASS PIPE

Max. Size

Penetration

Diameter

Rating

(h)

Max Size

Opening

Floor or Wall

System

A/D Firebarrier

Product Required

Application

Thickness

System No.

 

CONCRETE CONSTRUCTION

3” PVC, CPVC

or smaller